In England, most homeowners with off-street parking no longer need planning permission to install an EV charger. The government removed the prior notification step on 29 May 2025, according to NICEIC. That does not mean you can skip every rule. Conservation areas, listed buildings and Article 4 directions still need checking, and building regulations apply to every installation. This guide covers what applies to a home or business charger, and what to check first.

Smarthometechnical
Plan Your EV Charger Installation
Smarthometechnical installs EV chargers across Dorset, Hampshire and Devon, alongside solar panels and battery storage.

Visit Smarthometechnical

TL;DR

Table of Contents

The short answer for England

The rule sits in Class D of Part 2, Schedule 2 of the General Permitted Development Order 2015, which covers an electrical outlet for recharging vehicles within an area lawfully used for off-street parking. The Planning Portal says that if your home has off-street parking, installing a home charger is likely to be permitted development. Permitted development means the planning permission is already granted nationally, so you do not apply.

That covers the common cases: a wall-mounted unit on your house or garage, or a freestanding pillar on your drive. It is a planning rule only. Your electrician still has to deal with the electrical and building side, covered further down.

These rules are for England. Scotland, Wales and Northern Ireland each have their own planning systems, so if you live there, ask your local council rather than assuming the English rules apply.

UK nations and their separate planning systems

The physical limits your charger must meet

Permitted development comes with conditions. For a home, the Planning Portal sets out limits on size and height:

Type of unit Limit in a dwellinghouse’s curtilage
Wall-mounted unit Must not exceed 0.2 cubic metres
Upstand (pillar) unit Must not exceed 1.6 metres in height

The charger must also be within an area lawfully used for off-street parking. In practice, that means your driveway, garage or a private parking space. Standard domestic units from mainstream manufacturers are almost always well within these sizes. Where we see trouble is with large pillar units or an unusual position, for example one close to a highway boundary. Check the exact conditions in the Order if your plan is unusual.

When you still need planning permission

The national right does not cover everything. According to the Planning Portal, you need to apply if:

The Portal’s advice is to check with your local planning authority before work starts if any of these apply. Article 4 directions are less well known than the other two. They are made locally, often to protect the look of a street, and they can remove rights you would otherwise assume you have. Your council’s planning team can tell you in a short email or call.

Listed buildings also need listed building consent for changes affecting their character. A charger bolted to a listed façade is exactly that sort of change, so do not rely on the permitted development rule there.

Southern England: where to look

If you are in Dorset, Hampshire or Devon, the check is the same, but it goes to your own district or unitary council. Many coastal and market-town centres in these counties have conservation areas, and that is where homeowners are most often caught out. A charger on a rear or side wall, out of view from the road, is often easier to agree than one on a front elevation, but that is a decision for the planning officer, not something to assume.

Planning is not building regulations

This is the mistake we see most. Homeowners hear “no planning permission” and assume nothing else applies. The Planning Portal states that building regulations approval is always required when installing a home EV charger, because the work is notifiable: it creates a new circuit.

There are two ways to deal with it:

  1. Use a registered competent person. Your installer certifies the work under their scheme and the compliance certificate is issued to you and your local authority.
  2. Notify building control yourself through a building notice or full plans application before work begins.

The first is simpler for nearly everyone. Keep the certificate. When you sell, a buyer’s solicitor may ask for evidence the circuit was installed properly, and missing paperwork can slow a sale.

Our team is MCS and NICEIC accredited, and we handle the notification as part of the job, so you do not need to contact building control yourself.

Since 30 June 2022, charge points sold in Great Britain for private use, whether domestic or workplace, must have smart functionality. The aim is to help manage demand on the grid, for example by shifting charging away from peak times.

For you as a customer, this has practical consequences:

The government’s minimum technical specification for residential chargepoints sets out the standards manufacturers must meet for grant-eligible units.

Before you book: the electrical side

Planning is often the easiest part. What decides cost and timing is your electrical supply:

A site survey settles all of this. A good installer should give you a clear quote after it, listing exactly what is included.

What if you have no driveway?

Permitted development only covers off-street parking, so if you park on the road, the position is harder. The tempting fix is a cable across the pavement. Hampshire County Council’s guidance for residents without off-street parking asks you to consider public safety and existing laws. A cable across a footway is a trip hazard, and it can fall foul of the Highways Act 1980, which can lead to removal of the equipment. Dorset Council’s EV charging infrastructure strategy also takes a cautious line on street furniture such as lamp columns. Devon County Council sets out the kinds of on-street charging infrastructure it will support.

Realistic options for terraced or flat owners:

Safety around charging varies by vehicle type too. If you are curious how slow public charging can be for small electric vehicles, this overview of public charging for scooter owners (in Bulgarian) shows the kind of waiting times involved.

Landlords, flats and businesses

Non-domestic chargers. The government’s consultation response says a planning application is not required for the majority of non-domestic chargepoints, with exceptions, such as where wider works are involved. Business sites with listed buildings or unusual layouts should still check.

Residential landlords. The OZEV-backed chargepoint grant for landlords gives up to 75% of purchase and installation cost, capped at £500 per socket, for up to 200 sockets a year. Applicants must be registered with Companies House or VAT registered. You cannot claim if the installation was required by building regulations or a planning condition. Grant terms change, so read the current page before you commit.

Our view

We install chargers across Dorset, Hampshire and Devon, and the same thing happens again and again. The planning rule change was welcome, but it created a new misunderstanding: that the job has become paperwork-free. It has not. The planning step went, and the electrical and building control steps stayed.

Our view — overview diagram

Our advice is simple. First, check your address for a conservation area or Article 4 direction, which takes ten minutes. Second, pick an installer who certifies the work and explains the load on your supply, not just the charger model. Third, if you have or plan solar or a battery, design the system together, because a smart charger earns its keep when it can use your own generation.

We would rather tell you that your supply cannot take a 7 kW charger alongside your heat pump than sell you one that trips the main fuse every evening.

— Simon

Getting your charger installed

If you are a homeowner, landlord or business in Dorset, Hampshire or Devon, we can survey your property, tell you whether planning applies, and take care of the electrical certification. Take a look at our EV charger installation service, or add solar and storage through our solar installations page.

Checklist before work starts

  1. Confirm you have lawful off-street parking.
  2. Check your property is not listed, in a conservation area or under an Article 4 direction.
  3. Choose a smart charger that fits the size limits.
  4. Get a survey and a written quote that includes building regulations certification.
  5. Keep the compliance certificate with your property documents.

FAQ

Do I need planning permission for a home EV charger in England?

Usually not. A charger on a driveway or in a garage is generally permitted development, as long as it meets the size limits. You do need to check first if you are in a conservation area, in a listed building or under an Article 4 direction.

Do I still need building regulations approval if planning is not required?

Yes. A new charger circuit is notifiable work. A registered competent person can certify it, or you can notify building control before work starts. Keep the certificate for when you sell.

Can I run a cable across the pavement to charge from the road?

Not safely or lawfully in most cases. Councils including Hampshire warn about trip hazards and highways law, and the equipment can be ordered removed. Look at a council chargepoint, a public charger, or creating off-street parking instead.

Does my charger have to be smart?

Yes, for home and workplace chargers sold in Great Britain since 30 June 2022. Your installer should supply a compliant model, so you do not have to check the specification yourself.

Do the same rules apply in Scotland, Wales and Northern Ireland?

Not necessarily. The permitted development change described here applies to England. Each nation has its own planning system, so ask your local council before you buy.