In England, most homeowners with off-street parking no longer need planning permission to install an EV charger. The government removed the prior notification step on 29 May 2025, according to NICEIC. That does not mean you can skip every rule. Conservation areas, listed buildings and Article 4 directions still need checking, and building regulations apply to every installation. This guide covers what applies to a home or business charger, and what to check first.
TL;DR
- In England, a charger on a driveway or in a garage is usually permitted development, so no planning application is needed, provided it meets the size and location limits.
- Conservation areas, listed buildings and Article 4 directions are the main exceptions. Ask your local planning authority before you book anyone.
- Planning permission and building regulations are separate. Every new charger circuit is notifiable work, usually covered by a registered competent person.
- Chargers sold in Great Britain for home or workplace use must be smart. Your installer should supply a compliant unit.
- No driveway? Trailing a cable across the pavement is not a workaround. Look at other options below.
Table of Contents
- The short answer for England
- The physical limits your charger must meet
- When you still need planning permission
- Planning is not building regulations
- Smart charging is a legal requirement
- Before you book: the electrical side
- What if you have no driveway?
- Landlords, flats and businesses
- Our view
- Getting your charger installed
- Checklist before work starts
- FAQ
- Sources
The short answer for England
The rule sits in Class D of Part 2, Schedule 2 of the General Permitted Development Order 2015, which covers an electrical outlet for recharging vehicles within an area lawfully used for off-street parking. The Planning Portal says that if your home has off-street parking, installing a home charger is likely to be permitted development. Permitted development means the planning permission is already granted nationally, so you do not apply.
That covers the common cases: a wall-mounted unit on your house or garage, or a freestanding pillar on your drive. It is a planning rule only. Your electrician still has to deal with the electrical and building side, covered further down.
These rules are for England. Scotland, Wales and Northern Ireland each have their own planning systems, so if you live there, ask your local council rather than assuming the English rules apply.

The physical limits your charger must meet
Permitted development comes with conditions. For a home, the Planning Portal sets out limits on size and height:
| Type of unit | Limit in a dwellinghouse’s curtilage |
|---|---|
| Wall-mounted unit | Must not exceed 0.2 cubic metres |
| Upstand (pillar) unit | Must not exceed 1.6 metres in height |
The charger must also be within an area lawfully used for off-street parking. In practice, that means your driveway, garage or a private parking space. Standard domestic units from mainstream manufacturers are almost always well within these sizes. Where we see trouble is with large pillar units or an unusual position, for example one close to a highway boundary. Check the exact conditions in the Order if your plan is unusual.
When you still need planning permission
The national right does not cover everything. According to the Planning Portal, you need to apply if:
- your property is in a conservation area
- it is a listed building
- permitted development rights have been removed by an Article 4 direction
The Portal’s advice is to check with your local planning authority before work starts if any of these apply. Article 4 directions are less well known than the other two. They are made locally, often to protect the look of a street, and they can remove rights you would otherwise assume you have. Your council’s planning team can tell you in a short email or call.
Listed buildings also need listed building consent for changes affecting their character. A charger bolted to a listed façade is exactly that sort of change, so do not rely on the permitted development rule there.
Southern England: where to look
If you are in Dorset, Hampshire or Devon, the check is the same, but it goes to your own district or unitary council. Many coastal and market-town centres in these counties have conservation areas, and that is where homeowners are most often caught out. A charger on a rear or side wall, out of view from the road, is often easier to agree than one on a front elevation, but that is a decision for the planning officer, not something to assume.
Planning is not building regulations
This is the mistake we see most. Homeowners hear “no planning permission” and assume nothing else applies. The Planning Portal states that building regulations approval is always required when installing a home EV charger, because the work is notifiable: it creates a new circuit.
There are two ways to deal with it:
- Use a registered competent person. Your installer certifies the work under their scheme and the compliance certificate is issued to you and your local authority.
- Notify building control yourself through a building notice or full plans application before work begins.
The first is simpler for nearly everyone. Keep the certificate. When you sell, a buyer’s solicitor may ask for evidence the circuit was installed properly, and missing paperwork can slow a sale.
Our team is MCS and NICEIC accredited, and we handle the notification as part of the job, so you do not need to contact building control yourself.
Smart charging is a legal requirement
Since 30 June 2022, charge points sold in Great Britain for private use, whether domestic or workplace, must have smart functionality. The aim is to help manage demand on the grid, for example by shifting charging away from peak times.
For you as a customer, this has practical consequences:
- A cheaper non-smart unit bought online is not a bargain if it cannot legally be sold for home use.
- Your installer should fit a compliant model and set it up, including your off-peak schedule.
- If you have solar panels or a battery, a smart charger can use surplus generation. See our guide to pairing an EV charger with solar panels in Hampshire.
The government’s minimum technical specification for residential chargepoints sets out the standards manufacturers must meet for grant-eligible units.
Before you book: the electrical side
Planning is often the easiest part. What decides cost and timing is your electrical supply:
- Fuse board and earthing. An older consumer unit may need replacing, and the earthing arrangement affects what protection the charger needs.
- Cable run. The distance from consumer unit to charger affects labour and materials.
- Load. A home charger draws a lot of power for hours. If you also have a heat pump, solar inverter or battery, the installer must check your total demand. Dynamic load balancing can avoid expensive supply upgrades; our article on EV charger load balancing explains how.
- Export limits. If you have solar, grid connection rules such as the G98 and G99 threshold may come into play.
A site survey settles all of this. A good installer should give you a clear quote after it, listing exactly what is included.
What if you have no driveway?
Permitted development only covers off-street parking, so if you park on the road, the position is harder. The tempting fix is a cable across the pavement. Hampshire County Council’s guidance for residents without off-street parking asks you to consider public safety and existing laws. A cable across a footway is a trip hazard, and it can fall foul of the Highways Act 1980, which can lead to removal of the equipment. Dorset Council’s EV charging infrastructure strategy also takes a cautious line on street furniture such as lamp columns. Devon County Council sets out the kinds of on-street charging infrastructure it will support.
Realistic options for terraced or flat owners:
- Ask your council about public or on-street chargepoints planned near you.
- Charge at work or at a public rapid charger for the time being.
- Create off-street parking (a dropped kerb and hardstanding), which has its own consent requirements. Speak to your highways authority first.
- Talk to your freeholder or managing agent if you live in a flat with a shared car park.
Safety around charging varies by vehicle type too. If you are curious how slow public charging can be for small electric vehicles, this overview of public charging for scooter owners (in Bulgarian) shows the kind of waiting times involved.
Landlords, flats and businesses
Non-domestic chargers. The government’s consultation response says a planning application is not required for the majority of non-domestic chargepoints, with exceptions, such as where wider works are involved. Business sites with listed buildings or unusual layouts should still check.
Residential landlords. The OZEV-backed chargepoint grant for landlords gives up to 75% of purchase and installation cost, capped at £500 per socket, for up to 200 sockets a year. Applicants must be registered with Companies House or VAT registered. You cannot claim if the installation was required by building regulations or a planning condition. Grant terms change, so read the current page before you commit.
Our view
We install chargers across Dorset, Hampshire and Devon, and the same thing happens again and again. The planning rule change was welcome, but it created a new misunderstanding: that the job has become paperwork-free. It has not. The planning step went, and the electrical and building control steps stayed.

Our advice is simple. First, check your address for a conservation area or Article 4 direction, which takes ten minutes. Second, pick an installer who certifies the work and explains the load on your supply, not just the charger model. Third, if you have or plan solar or a battery, design the system together, because a smart charger earns its keep when it can use your own generation.
We would rather tell you that your supply cannot take a 7 kW charger alongside your heat pump than sell you one that trips the main fuse every evening.
— Simon
Getting your charger installed
If you are a homeowner, landlord or business in Dorset, Hampshire or Devon, we can survey your property, tell you whether planning applies, and take care of the electrical certification. Take a look at our EV charger installation service, or add solar and storage through our solar installations page.
Checklist before work starts
- Confirm you have lawful off-street parking.
- Check your property is not listed, in a conservation area or under an Article 4 direction.
- Choose a smart charger that fits the size limits.
- Get a survey and a written quote that includes building regulations certification.
- Keep the compliance certificate with your property documents.
FAQ
Do I need planning permission for a home EV charger in England?
Usually not. A charger on a driveway or in a garage is generally permitted development, as long as it meets the size limits. You do need to check first if you are in a conservation area, in a listed building or under an Article 4 direction.
Do I still need building regulations approval if planning is not required?
Yes. A new charger circuit is notifiable work. A registered competent person can certify it, or you can notify building control before work starts. Keep the certificate for when you sell.
Can I run a cable across the pavement to charge from the road?
Not safely or lawfully in most cases. Councils including Hampshire warn about trip hazards and highways law, and the equipment can be ordered removed. Look at a council chargepoint, a public charger, or creating off-street parking instead.
Does my charger have to be smart?
Yes, for home and workplace chargers sold in Great Britain since 30 June 2022. Your installer should supply a compliant model, so you do not have to check the specification yourself.
Do the same rules apply in Scotland, Wales and Northern Ireland?
Not necessarily. The permitted development change described here applies to England. Each nation has its own planning system, so ask your local council before you buy.
Sources
- NICEIC: EV charger regulations in England
- legislation.gov.uk: General Permitted Development Order 2015, Class D
- Planning Portal: permitted development for EV chargers
- Planning Portal: building regulations for EV charging
- GOV.UK: regulations for EV smart charge points
- GOV.UK: residential chargepoints minimum technical specification
- Hampshire County Council: EV charging guidance for residents
- Dorset Council: EV charging infrastructure strategy 2025 to 2028
- Devon County Council: electric vehicle charging
- GOV.UK: changes to permitted development rights for EV charging
- Find a grant: chargepoint grants for landlords