Powering a shed, garage or garden room means adding a new circuit to your home’s installation, and in England that is notifiable work: it has to be carried out by a registered electrician or notified to Building Control before it starts. The safest and simplest route is to have an electrician design, install and test the supply, then hand you the certificates that prove it. At Smart Home Technical we are electrical contractors working across Dorset, Hampshire and Devon, and outbuilding supplies are exactly the kind of job where getting the design and paperwork right first time saves money later.
This guide explains what the rules say, what a proper supply to an outbuilding involves, what affects the cost and what you should receive when the job is finished.
TL;DR
- A supply from your house to a shed or outbuilding is a new circuit, and an extension lead is not a substitute for one.
- New circuits are notifiable under the Building Regulations in England: use a registered competent-person electrician or apply to Building Control before work starts.
- Cable size depends on how far the outbuilding is and what you will run in it, so decide the use before you ask for a quote.
- Expect an Electrical Installation Certificate showing the work was tested, plus a Building Regulations compliance certificate.
- Planning and Building Regulations are separate: check both if the outbuilding itself is new.
Table of Contents
- What counts as outbuilding electrics
- Why an extension lead is not a shed power supply
- The rules in England: what is notifiable
- Decide what the shed will do first
- How a safe supply to a shed is built
- Cost: what moves the price
- What you should receive when the job is done
- A step-by-step route from idea to energised shed
- Lighting, sockets and everyday use
- Our perspective
- Powering your outbuilding with us
- FAQ
- Sources
What counts as outbuilding electrics
Outbuilding electrics means any fixed electrical installation in a building separate from the house: a garden shed, detached garage, workshop, summerhouse, greenhouse or garden office. It also covers garden wiring such as outdoor sockets and lighting.
The Institution of Engineering and Technology (IET), which publishes the wiring standard BS 7671, says in its Part P guidance that the rules apply to fixed electrical installations in dwellings and associated buildings, including sheds, detached garages, greenhouses and garden wiring. Part P is the section of the Building Regulations that deals with electrical safety in homes in England.
So the shed at the bottom of a Dorset garden is covered in the same way as the kitchen. The difference is that the cable has to leave the house, cross open ground and survive weather, spades and damp, which is why the design matters more than it first appears.

Why an extension lead is not a shed power supply
A lead trailed from a back-door socket across the lawn is tempting for a weekend. It is not a supply. Lengthy leads are exposed to damage, heat when coiled, and moisture, and they are not protected or designed as part of the fixed installation.
A proper supply to an outbuilding is a new circuit, wired back to your consumer unit (the fuse board) with its own protection. The UK energy site Selectra makes the point plainly in its guide to powering a shed or garden office: a supply to an outbuilding is a circuit, and an extension lead is not a supply.
If you want lights, a few sockets, a heater or a chest freezer in the building, you need the circuit.
The rules in England: what is notifiable
This is the part most homeowners are unsure about, so it is worth being precise.
New circuits need the Building Regulations route
The IET’s guidance identifies installing a new circuit as notifiable work, so a new supply from your home to a shed falls within it, as explained in its Part P FAQ. The legal basis is in the Building Regulations amendment, which says that a building notice or full plans are needed for a new circuit, a replacement consumer unit or alterations to circuits in a special location.
Local authorities give the same message in plain terms. The Hampshire Building Control Partnership recommends a registered competent-person electrician and lists supplying a garage or outhouse as an example of notifiable work. If the work is done by someone who is not registered, you apply to Building Control before it starts.
What you can do without approval
Not every electrical job is notifiable. Dorset Council’s page on when you do not need approval says some minor repairs and maintenance, like-for-like replacement of less than 25% of an element, and additional sockets or lighting points on existing circuits generally do not need Building Regulations approval, subject to exceptions.
The practical reading: adding a socket to a circuit that already serves the shed is usually minor. Creating the first supply to it is not.
Planning is a separate question
Dorset Council also cautions that being exempt from Building Regulations does not itself give a planning exemption. If you are building a new garden room, or the outbuilding is close to a boundary, in a conservation area or in a coastal or protected landscape, check planning separately before you commit to the electrics.
The rules above apply in England. Dorset, Hampshire and Devon are all in England, so they apply to the areas we cover.
Decide what the shed will do first
Before anyone prices the job, write down what will run in the outbuilding. A bulb and a phone charger is a very different job from a workshop with a compressor, or a garden office with a heater, computer and kettle.
Selectra’s guide says the load and the cable length both affect voltage drop and cable sizing. Voltage drop is the loss of voltage along a long cable: the longer the run and the heavier the load, the more you lose, and equipment can run poorly or overheat. The same article describes BS 7671 limits of 3% for lighting and 5% for everything else.
A quick planning list helps:
- Distance from the consumer unit to the outbuilding, and the route the cable would take.
- Equipment you will use now, and what you might add later, such as a heater, power tools or a hot tub-style load.
- Lighting inside and outside, and whether you want switching from the house.
- Data or CCTV, if you want a network connection or a camera at the bottom of the garden.
- Future use: a shed that becomes a gym or office in two years is cheaper to wire once for that purpose than twice.
If you are also thinking about an electric vehicle, a detached garage is a natural place for a charger. Our guide to EV charging safety at home covers what to consider, and our EV charger installation service handles both house and garage locations.
How a safe supply to a shed is built
The detail should be set by the electrician who signs the work off, but it helps to know what a good installation involves so you can follow the quote.
Armoured cable on an underground run
For an underground supply, Selectra’s guide identifies SWA cable, protection against mechanical damage, warning tape, RCD protection and a deliberate earthing arrangement as the points to consider. In plain terms:
- SWA is steel wire armoured cable, built to be buried or fixed outdoors.
- Mechanical protection and warning tape reduce the risk of someone digging through a live cable.
- An RCD (residual current device) cuts the power quickly if current leaks, for example through a person or a damaged cable.
- Earthing has to be planned for the outbuilding rather than assumed, because the building is a separate structure in the ground.
The circuit’s own protection at the house end
The new circuit is connected at your consumer unit with the right protective devices. If your existing unit has no spare way, or is old, the electrician may recommend changing it. A replacement consumer unit is itself notifiable, as the legislation above makes clear, so it is better to plan both together.
Inside the outbuilding
A small outbuilding consumer unit or switch point lets you isolate the shed from inside, and the sockets and lighting are then wired from it. Damp and temperature swings are the reason the fittings, enclosures and cable routes need to suit the building: a drilled-through wall that lets water in is a common cause of problems years later.

Cost: what moves the price
People search for the cheapest way to connect a shed, and the honest answer is that the cheapest route is the one done correctly once. The cost is driven by:
- Cable length and the route: a short run along a fence is not the same as a long crossing of a patio, driveway or established border.
- Ground work: digging through lawn, gravel, paving or concrete changes labour.
- Load: higher loads need heavier cable and protection.
- Your consumer unit: whether it has a spare way and modern protection, or needs replacing.
- Inside fit-out: the number of sockets and lights, and any data or security cabling.
- Building Control fees: if the work is notified to the council rather than certified by a registered installer. The Hampshire Building Control Partnership says local charges are individually determined and should be confirmed before work begins.
We do not publish a standard price for outbuilding circuits because the route and load decide it. A site visit or clear photos and measurements give a quote you can rely on.
What you should receive when the job is done
The finished job is more than a working socket. According to the Hampshire Building Control Partnership, the electrician should provide an Electrical Installation Certificate showing the work was tested and a Building Regulations compliance certificate. Its guidance says the compliance certificate is arranged within 30 days by a Part P electrician. The same page says the work should meet BS 7671.
Keep both documents. They matter when you sell the house, when you claim on insurance after an incident, and when a landlord or buyer’s surveyor asks what has been added. If you let a property, the same record-keeping logic applies to your periodic checks, which we cover in our guide for landlords on EICR deadlines.
A step-by-step route from idea to energised shed
- Define the use. List equipment, lighting and any future plans, as above.
- Check the building itself. If the outbuilding is new or large, confirm planning and Building Regulations for the structure with your council. Dorset Council’s guidance is a useful starting point for Dorset homes, and Hampshire and Devon councils publish their own.
- Measure the route. Note the distance from the consumer unit, obstacles and surfaces.
- Get a written quote from a registered electrician. It should name the cable type, protection, the consumer unit work and the certificates you will receive.
- Agree the notification route. Either the registered electrician certifies the work, or Building Control is notified before the start.
- Installation. Trenching, cable, protective measures, outbuilding wiring and connection at the house.
- Testing and certificates. The Electrical Installation Certificate and compliance certificate are issued.
- Keep the records with your property documents.
On steps 4 to 7 we are in a position to help directly: we are NICEIC accredited, and electrical testing is part of what we offer alongside installation.
Lighting, sockets and everyday use
Once the supply is in, a few habits keep the outbuilding safe. Use sockets and equipment suited to the conditions, and do not plug in extension leads on top of a fixed supply to run more than it was designed for. If a heater or tool trips the protection repeatedly, stop and have it checked rather than resetting it until it holds.
A simple routine is worth building in:
- Press the test button on the RCD protecting the circuit at the intervals shown on the device.
- Look at the outbuilding’s cable entry, fittings and sockets for damp, condensation, pests or damage.
- Keep the area around the outbuilding consumer unit clear.
- Repeat the check after storms or flooding, and have a qualified electrician look at anything that has been wet.
If the outbuilding is used as part of a business or let out, a periodic inspection becomes part of your duty of care. Our guide to fixed wire testing for commercial properties explains how that testing works.
Our perspective
A shed circuit looks like a small job, and that is exactly why it goes wrong. People see a few metres of cable and a socket, and they underestimate the cable run, the earthing and the paperwork.
What we want every homeowner in Dorset, Hampshire and Devon to take away is that the supply should be designed for what the building will be used for in five years, not what it holds today. Wire it once, wire it properly, and have it tested and certified.
We work across electrical installations, from solar and battery systems to EV chargers, home automation, security and testing, so we look at an outbuilding as part of the whole property rather than a stand-alone socket. If you are adding a garden office now, think about whether a future EV charger, solar system or battery might share the route. Planning it together is usually tidier and avoids digging the garden twice.
We are NICEIC accredited, and the people who choose us tell us they value clear communication and a clean, tidy site. That is how we like to leave a job.
Simon
Powering your outbuilding with us
If you want a shed, garage or garden room supplied properly, we install and test electrical work for homes and businesses across Dorset, Hampshire and Devon. Tell us what the building will be used for and roughly how far it is from the house, and we will talk through the options. You can see everything we do on the Smart Home Technical site, and if you are also considering a detached-garage charger, our EV charger service is the place to start.

If the outbuilding will also carry solar or a battery, our Solar & Battery Service & Maintenance Plan is £175 per year.
FAQ
Is running power to a shed notifiable work?
Yes, in England a new circuit to a shed is notifiable under the Building Regulations. You can use a registered competent-person electrician, or notify Building Control before work starts. The Hampshire Building Control Partnership lists supplying a garage or outhouse as an example of notifiable work.
Can I just use an extension lead to power my shed?
An extension lead is not a shed power supply. A supply to an outbuilding is a fixed circuit with its own protection, wired from your consumer unit. For anything beyond very short, supervised use, have the circuit installed by an electrician.
What cable is used for an underground shed supply?
Steel wire armoured (SWA) cable is the cable usually considered for an underground run, with protection against mechanical damage, warning tape, RCD protection and a planned earthing arrangement. The right size depends on cable length and load, so it is set by the electrician as part of the design.
What paperwork should I get after the work?
You should receive an Electrical Installation Certificate showing the work was tested, and a Building Regulations compliance certificate. Keep both with your house documents, because they are the proof the work was done to the standard if you sell, insure or let the property.
Do I need planning permission as well?
Possibly. Building Regulations and planning are separate systems, and an exemption from one does not give an exemption from the other. If the outbuilding is new, large or in a sensitive location, check with your local council.
Sources
- The Building Regulations &c. (Amendment) Regulations 2012, regulation 6
- Domestic electrical work, Hampshire Building Control Partnership
- When you do not need approval, Dorset Council
- Part P frequently asked questions, IET
- Power to a shed or garden office, Selectra